Maxtor 777 W V1.0 Manual de instrucciones Pagina 14

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 58
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 13
14 8921ADT Instruction Manual
Power Up
Power Up
The front LED indicators and configuration switches are illustrated in
Figure 5. Upon power-up, the green PWR LED should light and the yellow
CONF LED should illuminate for a few seconds for the duration of module
initialization.
Figure 5. LEDs and Configuration Switches
TRK ON (green)
FAULT (red)
LOCKED (green)
COMM (yellow)
CONFIG (yellow)
BANK 2 (yellow)
INPUT SELECT (green)
1
2
3
4
REM OVR (yellow)
PWR (green)
CH1
> -40 dBFS/CLIP LEDS
CH2
CH3
CH4
8204_06
(green or red)
Vista de pagina 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 57 58

Comentarios a estos manuales

Sin comentarios